中华商务全球图书采选平台SinoVIP Global Book Services
在线询价Online Enquiry
订单跟踪Order Tracking
登录Sign In
/
注册Sign Up
我的单据My Lists
帮助中心Help & Services
首页/Home>书目采选/Bibliographic selection>书籍详情/Book Detail:Simulation of Hydropower Energy Generation>
Simulation of Hydropower Energy Generation
Rehman, Waqar-Ur-

Simulation of Hydropower Energy Generation

水力发电模拟

ISBN
9783639232066
作者Author
Rehman, Waqar-Ur-
出版社Publisher
VDM Verlag
出版时间Published
2010-01
产品分类SIC
01020K0703-一般工业技术
装帧Format
平装
语种Language
英文
页数Page
108
开本Size
20开
数量Qty
编辑推荐 | Editors' Choice
Power Generation is essentially required for improving and maintaining the infrastructure of the overall development of a nation. It is the tool to forge the economic growth of any country. Spat Gah-Gabarband Gah valleys consisted of Upper Spat Gah (US), Middle Gabarband (MG), both with dams, and Lower SpatGah (LS) stage as a runoff river scheme and run almost parallel in east west direction for about 30 km, up to their zenith at elevation 2800 m. The project aims for development of a high head hydropower scheme, located on the left bank of the Indus River in Kohistan district (NWFP). The main objective of this study was development and optimization of Lower Spat Gah (LS) scheme in cascade and simulation of energy generation at with and without addition of the Upper schemes of the cascade. Finally simulation results are presented in this book and recommendations were drawn for researchers and planners. The author appreciate the efforts of Barthlemy Chaton and his team in facilitating and highly acknowledge publishing of it by VDM Publishing House Ltd., for technical knowledge sharing internationally.