中华商务全球图书采选平台SinoVIP Global Book Services
在线询价Online Enquiry
订单跟踪Order Tracking
登录Sign In
/
注册Sign Up
我的单据My Lists
帮助中心Help & Services
首页/Home>书目采选/Bibliographic selection>书籍详情/Book Detail:Hydropower Development-A Case Study in Pakistan>
Hydropower Development-A Case Study in Pakistan
Rehman, Waqar-Ur-

Hydropower Development-A Case Study in Pakistan

水电开发——以巴基斯坦为例

ISBN
9783639230994
作者Author
Rehman, Waqar-Ur-
出版社Publisher
VDM Verlag
出版时间Published
2010-01
产品分类SIC
01020K0703-一般工业技术
装帧Format
平装
语种Language
英文
页数Page
72
开本Size
20开
数量Qty
编辑推荐 | Editors' Choice
Power Generation is essentially required for improving and maintaining the infrastructure of the overall development of a nation. It is the tool to forge the economic growth of any country. Ghazi-Barotha is a runoff river hydropower project located at downstream of Tarbela and on left bank of Indus River. The project was studied to feasibility level in 1990, implementation was started in 1995 and now in operation since 2003. The project is being operated with full capacity during peak hours but be influenced by Kalabagh reservoir during August to March. The reduction in head to some extent reduces the power and energy. This research work had analyzed and evaluated the extent of reduced power and energy considering 20 year flow data. Finally conclusion and recommendations are drawn for researchers and planners. The author appreciate the efforts of Barthlemy Chaton and his team in facilitating and highly acknowledge publishing of it by VDM Publishing House Ltd., for technical knowledge sharing internationally.